During the fracture process, materials of larger size are subjected to increased forces so that they break into smaller pieces. The lumps produced in mining are ground into gravel or powder, with some machines capable of processing up to 350 tonnes per hour.
Our team undertakes complete refurbishment and installation of crushing equipment.



